Connect with us

News

Enhancing Connectivity: Expanded Metrolink Service Benefits Antelope Valley Line Riders

Enhanced Metrolink service on Antelope Valley Line: improved regional transit options.

Published

on

Last Updated on July 4, 2024 by Daily News Staff

avline happenings

Metrolink, Southern California’s premier regional rail service, has provided enhanced transportation options for commuters and residents along the Antelope Valley (AV) Line. With the support of the Los Angeles County Metropolitan Transportation Authority (Metro), Metrolin doubled its weekend trains and introducing additional weekday services. This expansion coincided with the opening of the new Vista Canyon Station, marking a significant milestone in the development of a multi-modal regional transit center. These improvements aimed to meet the evolving needs of passengers, improve accessibility, and paved the way for future enhancements to the entire Metrolink system.

Increased Service and Connectivity:
Starting from October 23rd, the AV Line witnessed a significant increase in its service frequency. A total of nine new trains have been added to the weekday and weekend schedule, thereby doubling the number of weekend trains available between Los Angeles and Lancaster. This expansion was made possible by an increase of $1.6 million in funding approved by the Metro Board. With this expansion, the AV Line will now offer the second-highest number of trains among all Metrolink service lines, providing passengers with greater flexibility and options.

The Importance of Vista Canyon Station:
The opening of Vista Canyon Station, located in the City of Santa Clarita, is a crucial milestone in the expansion of the Metrolink network. This new station, part of a multi-modal regional transit center, further enhances accessibility and connectivity for commuters. With Vista Canyon Station becoming Metrolink’s 67th station, the reach of the rail service extends across Los Angeles, Orange, Riverside, San Bernardino, Ventura, and San Diego counties. The station’s strategic location serves as a catalyst for economic development and reinforces Metrolink’s commitment to providing efficient transportation solutions.

Benefits for Riders and Communities:
The expanded AV Line schedule brings numerous benefits to both commuters and the communities it serves. The increased weekday and weekend service accommodates shifting demands and provides passengers with more travel options outside traditional commuter hours. This enhanced schedule is particularly advantageous for individuals attending sporting and entertainment events in Los Angeles. By offering improved transit flexibility and convenience, Metrolink aims to attract new riders and increase overall ridership on the AV Line.

Acknowledgements and Future Prospects:
LA County Board Supervisor Kathryn Barger, a member of both the Metro and Metrolink boards of directors, expresses her excitement about the initiative to restore and improve Antelope Valley Line service. The support of Metro and the collaborative efforts of various county transportation agencies have been instrumental in making this expansion possible. Metrolink CEO Darren Kettle highlights the significance of this development, stating that the enhanced schedule not only benefits AV Line commuters but also provides a glimpse into what regional passenger rail services could look like across the entire Metrolink system in the near future.

The expanded Metrolink service on the Antelope Valley Line, in conjunction with the opening of Vista Canyon Station, marks a significant step forward in improving transportation options for commuters in Southern California. The increased frequency of trains, along with the added convenience and accessibility, will undoubtedly benefit riders and contribute to the growth and success of the Antelope Valley and Santa Clarita regions. Metrolink’s commitment to enhancing connectivity and meeting the evolving needs of passengers sets a positive precedent for the future of regional rail services in the area.

https://metrolinktrains.com/news/metrolink-news/metrolink-expands-antelope-valley-line-weekday-and-weekend-service-on-oct-23/

https://www.metro.net/

https://stmdailynews.com/category/the-bridge/urbanism

Start Your Morning Informed

Get the STM Morning Brief delivered to your inbox every weekday with breaking news, transportation updates, technology, science, and trending stories.

STM News Brief Ad 2

We don’t spam! Read our privacy policy for more info.

Advertisement
Get More From A Face Cleanser And Spa-like Massage

astronomy

Large Asteroid 1999 AN10 Will Safely Pass Earth in August 2027

A large asteroid, 1999 AN10, will safely pass Earth on August 7, 2027, at roughly the Moon’s distance. The flyby could offer binocular views and valuable opportunities for scientific study.

Published

on

Last Updated on November 15, 2026 by Daily News Staff

A close approach near the Moon’s distance could give skywatchers a chance to spot the asteroid with binoculars.

Illustration of asteroid 1999 AN10 passing near Earth against a star-filled background.
Artist’s illustration of asteroid 1999 AN10, which will safely pass Earth on August 7, 2027. Not to scale.

A large asteroid will sweep past Earth on August 7, 2027, offering scientists a valuable research opportunity and skywatchers a potential binocular target. The asteroid, known as 1999 AN10, will safely miss our planet.

How close will asteroid 1999 AN10 come to Earth?

NASA’s Jet Propulsion Laboratory predicts the space rock will pass roughly 242,000 miles (390,000 kilometers) from Earth’s center—about the same distance as the Moon. That is close in astronomical terms, but the predicted flyby poses no impact threat.

Its exact size remains uncertain. JPL estimates a diameter of about 800 meters, or half a mile, while noting considerable uncertainty. Upcoming observations could help researchers better determine its dimensions, shape, and surface features.

Although 1999 AN10 is classified as a potentially hazardous asteroid, that designation describes its orbital proximity and size. It does not mean the asteroid is expected to strike Earth during this encounter.

Can you see the asteroid in August 2027?

For astronomy enthusiasts, the flyby could provide a memorable observing opportunity. JPL predicts the asteroid will reach approximately magnitude 7.5 on the night of August 6–7, making it a possible target for binoculars or small telescopes under suitable conditions. It is expected to be too faint to see with the unaided eye.

Scientists also plan radar observations that could reveal detailed surface features. The encounter offers a chance to learn more about a large near-Earth asteroid as it passes safely through our cosmic neighborhood.

Explore more astronomy and science stories in The Knowledge at STM Daily News.

Sources:

● NASA/JPL, Goldstone Radar Observations Planning: https://echo.jpl.nasa.gov/asteroids/1999an10.2027.goldstone.planning.html

● EarthSky, Mountain-sized asteroid 1999 AN10 to pass close to Earth in 2027: https://earthsky.org/space/mountain-sized-asteroid-1999-an10-pass-close-to-earth-aug-7-2027/

Advertisement
Get More From A Face Cleanser And Spa-like Massage
Continue Reading

Transportation

FAA Nationwide Ground Stop Disrupts Thousands of Flights, Exposes Aging Air Traffic Control Infrastructure

FAA nationwide ground stop on November 13, 2026, disrupts U.S. flights and raises concerns about aging air traffic control infrastructure.

Published

on

Last Updated on November 14, 2026 by Daily News Staff

Major communications and radar disruptions temporarily halted departures across the United States on Friday, raising fresh concerns about the reliability of the nation’s aviation infrastructure.

Commercial passenger aircraft parked at airport gates with an air traffic control tower in the background, illustrating a  FAA nationwide ground stop.
Commercial aviation faced widespread disruption following a nationwide FAA ground stop on November 13, 2026. AI-generated illustration of Oceanwide Plaza; not a documentary photograph.

A major technical failure involving the Federal Aviation Administration’s (FAA) air traffic control systems triggered a nationwide ground stop on Friday, November 13, 2026, disrupting thousands of flights and leaving travelers stranded at airports across the United States.

The FAA temporarily suspended aircraft departures as technicians worked to address communications and radar system problems that threatened the reliability of air traffic control operations.

The nationwide ground stop reportedly began at approximately 3:54 p.m. Eastern Time and was lifted around 8:15 p.m., lasting more than four hours.

Aging Technology Raises Safety Concerns

According to reports, the disruption involved aging telecommunications equipment within the nation’s air traffic control infrastructure.

Transportation Secretary Sean Duffy indicated that older equipment experienced problems as newer technology was integrated into the network, resulting in intermittent communications and radar information failures.

Officials reported no evidence that the outage resulted from a cyberattack.

The incident highlights ongoing concerns about the FAA’s aging infrastructure and the challenges of modernizing critical aviation systems while maintaining safe and reliable operations.

Phoenix Airports Among Those Affected

The disruption also affected air travel throughout Arizona, including Phoenix Sky Harbor International Airport, Phoenix Deer Valley Airport, Phoenix-Mesa Gateway Airport, and Scottsdale Airport.

At Phoenix Sky Harbor, local reports indicated approximately 338 flight delays and 155 cancellations by Friday evening.

Advertisement
Get More From A Face Cleanser And Spa-like Massage

Nationwide, early reports indicated more than 10,000 delayed flights and over 4,000 cancellations, with an estimated 1.5 million passengers affected.

Airlines continued working to restore normal schedules after the FAA lifted the ground stop.

Questions Remain About System Reliability

The incident has renewed attention on efforts to replace outdated air traffic control equipment and strengthen the resilience of the national aviation network.

Although departures resumed Friday evening, the disruption raised important questions about whether the FAA’s existing infrastructure can adequately support growing air traffic demands.

Federal aviation officials are expected to continue evaluating the failure and measures needed to prevent similar nationwide disruptions.

For travelers, the incident serves as a reminder that a technical problem affecting the nation’s aviation network can quickly create widespread delays, cancellations, and travel uncertainty.

STM Daily News — News You Can Use This Moment!

Sources and Further Information

https://stmdailynews.com/los-angeles-graffiti-towers-cleaned-up-as-oceanwide-plaza-awaits-next-chapter/
Continue Reading

Daily News

Los Angeles’ ‘Graffiti Towers’ Cleaned Up as Oceanwide Plaza Awaits Next Chapter

Published

on

Last Updated on November 13, 2026 by Daily News Staff

STM Daily News | November 12, 2026

Oceanwide Plaza’s unfinished towers in downtown Los Angeles after exterior graffiti removal.
AI-generated illustration of Oceanwide Plaza; not a documentary photograph.

Graffiti Cleanup Transforms Oceanwide Plaza

LOS ANGELES — The unfinished skyscrapers known as downtown Los Angeles’ “Graffiti Towers” have reached a visible milestone: most of the exterior tagging has been removed, although completing the long-stalled Oceanwide Plaza development remains a separate challenge.

City officials celebrated the cleanup November 12. According to the mayor’s office, crews cleared graffiti from roughly 250 balconies across the three-tower complex opposite Crypto.com Arena and near the Los Angeles Convention Center. Remaining work has included touch-ups on windows and other exterior areas.

Oceanwide Plaza was envisioned as a mixed-use destination with residences, a luxury hotel, shops and restaurants. Construction stopped in 2019 after Beijing-based developer Oceanwide Holdings could no longer finance the project.

https://stmdailynews.com/lax-skylink-is-99-complete-but-new-financial-and-legal-questions-cloud-october-opening/

In early 2024, trespassers covered the unfinished towers with graffiti, turning them into an internationally recognized sight. The property also attracted dangerous stunts and heightened concerns about security.

The development entered bankruptcy in February 2024. This July, a bankruptcy court approved a purchase arrangement involving KPC Square, a joint venture between KPC Group and Lendlease. Graffiti removal began while the acquisition was still pending.

What Comes Next for LA’s Graffiti Towers?

The partnership is targeting a January 2027 closing, according to the Los Angeles Business Journal. Financing, a construction contract and required approvals remain important steps before the development can be completed.

For downtown residents and businesses, the cleanup marks tangible progress at a prominent property. However, it does not mean the towers are ready to open, and no firm opening date has been announced.

Sources

Continue Reading

Trending