News
USPS Brings Mail Management to Your Pocket with New Informed Delivery App
The USPS launched the Informed Delivery Mobile app, enhancing mail tracking with features like push notifications, biometric login, and direct mail interaction. This convenient tool helps busy households manage incoming mail and packages effectively, now accessible on smartphones.
Last Updated on October 22, 2025 by Daily News Staff
Your daily mail preview just got a whole lot more convenient.
The United States Postal Service rolled out its new Informed Delivery Mobile app this week, giving customers a sleek, on-the-go way to keep tabs on incoming mail and packages before they hit the mailbox.
Announced October 2, the free app builds on USPS’s existing Informed Delivery service—which has been helping people digitally preview their letter-size mail and track packages through email notifications and the web. Now, that same functionality lives right in your smartphone.
What’s Inside the App
The new mobile experience packs several features designed to make mail management easier:
Push notifications keep you updated the moment there’s movement on your incoming mail or packages—no need to refresh your email or log into a website.
Biometric login options (think Face ID or fingerprint) add a layer of security while making access quick and seamless.
Enhanced package tracking goes beyond basic status updates. You can scan tracking numbers or barcodes directly through the app and even share package status with family members, roommates, or anyone else waiting on that delivery.
Direct mail interaction lets you view and manage your incoming mail right from your phone, giving you a digital preview of what’s headed your way.
Why It Matters
For busy households juggling work, errands, and life in general, knowing what’s coming in the mail—and when—can be a game-changer. Whether you’re expecting an important document, coordinating package deliveries with neighbors, or just want to avoid unnecessary trips to the mailbox, the app puts that control in your hands.
The Informed Delivery service itself isn’t new, but bringing it to mobile with push notifications and enhanced tracking features makes it significantly more accessible. It’s the kind of everyday convenience that fits naturally into how we already manage our lives—through our phones.
Get the App
The Informed Delivery Mobile app is available now for free on both the Apple App Store and Google Play.
For more details or to download, visit usps.com/apps/informed-delivery.
The U.S. Postal Service is an independent federal establishment serving nearly 169 million addresses nationwide. As part of its 10-year Delivering for America transformation plan, USPS continues modernizing its network and services while maintaining its role as one of America’s most trusted brands.
SOURCE U.S. Postal Service
STM Daily News is a vibrant news blog dedicated to sharing the brighter side of human experiences. Emphasizing positive, uplifting stories, the site focuses on delivering inspiring, informative, and well-researched content. With a commitment to accurate, fair, and responsible journalism, STM Daily News aims to foster a community of readers passionate about positive change and engaged in meaningful conversations. Join the movement and explore stories that celebrate the positive impacts shaping our world.
https://stmdailynews.com/
astronomy
Large Asteroid 1999 AN10 Will Safely Pass Earth in August 2027
A large asteroid, 1999 AN10, will safely pass Earth on August 7, 2027, at roughly the Moon’s distance. The flyby could offer binocular views and valuable opportunities for scientific study.
Last Updated on November 15, 2026 by Daily News Staff
A close approach near the Moon’s distance could give skywatchers a chance to spot the asteroid with binoculars.
A large asteroid will sweep past Earth on August 7, 2027, offering scientists a valuable research opportunity and skywatchers a potential binocular target. The asteroid, known as 1999 AN10, will safely miss our planet.
How close will asteroid 1999 AN10 come to Earth?
NASA’s Jet Propulsion Laboratory predicts the space rock will pass roughly 242,000 miles (390,000 kilometers) from Earth’s center—about the same distance as the Moon. That is close in astronomical terms, but the predicted flyby poses no impact threat.
Its exact size remains uncertain. JPL estimates a diameter of about 800 meters, or half a mile, while noting considerable uncertainty. Upcoming observations could help researchers better determine its dimensions, shape, and surface features.
Although 1999 AN10 is classified as a potentially hazardous asteroid, that designation describes its orbital proximity and size. It does not mean the asteroid is expected to strike Earth during this encounter.
Can you see the asteroid in August 2027?
For astronomy enthusiasts, the flyby could provide a memorable observing opportunity. JPL predicts the asteroid will reach approximately magnitude 7.5 on the night of August 6–7, making it a possible target for binoculars or small telescopes under suitable conditions. It is expected to be too faint to see with the unaided eye.
Scientists also plan radar observations that could reveal detailed surface features. The encounter offers a chance to learn more about a large near-Earth asteroid as it passes safely through our cosmic neighborhood.
Explore more astronomy and science stories in The Knowledge at STM Daily News.
Sources:
● NASA/JPL, Goldstone Radar Observations Planning: https://echo.jpl.nasa.gov/asteroids/1999an10.2027.goldstone.planning.html
● EarthSky, Mountain-sized asteroid 1999 AN10 to pass close to Earth in 2027: https://earthsky.org/space/mountain-sized-asteroid-1999-an10-pass-close-to-earth-aug-7-2027/
Transportation
FAA Nationwide Ground Stop Disrupts Thousands of Flights, Exposes Aging Air Traffic Control Infrastructure
FAA nationwide ground stop on November 13, 2026, disrupts U.S. flights and raises concerns about aging air traffic control infrastructure.
Last Updated on November 14, 2026 by Daily News Staff
Major communications and radar disruptions temporarily halted departures across the United States on Friday, raising fresh concerns about the reliability of the nation’s aviation infrastructure.
A major technical failure involving the Federal Aviation Administration’s (FAA) air traffic control systems triggered a nationwide ground stop on Friday, November 13, 2026, disrupting thousands of flights and leaving travelers stranded at airports across the United States.
The FAA temporarily suspended aircraft departures as technicians worked to address communications and radar system problems that threatened the reliability of air traffic control operations.
The nationwide ground stop reportedly began at approximately 3:54 p.m. Eastern Time and was lifted around 8:15 p.m., lasting more than four hours.
Aging Technology Raises Safety Concerns
According to reports, the disruption involved aging telecommunications equipment within the nation’s air traffic control infrastructure.
Transportation Secretary Sean Duffy indicated that older equipment experienced problems as newer technology was integrated into the network, resulting in intermittent communications and radar information failures.
Officials reported no evidence that the outage resulted from a cyberattack.
The incident highlights ongoing concerns about the FAA’s aging infrastructure and the challenges of modernizing critical aviation systems while maintaining safe and reliable operations.
Phoenix Airports Among Those Affected
The disruption also affected air travel throughout Arizona, including Phoenix Sky Harbor International Airport, Phoenix Deer Valley Airport, Phoenix-Mesa Gateway Airport, and Scottsdale Airport.
At Phoenix Sky Harbor, local reports indicated approximately 338 flight delays and 155 cancellations by Friday evening.
Nationwide, early reports indicated more than 10,000 delayed flights and over 4,000 cancellations, with an estimated 1.5 million passengers affected.
Airlines continued working to restore normal schedules after the FAA lifted the ground stop.
Questions Remain About System Reliability
The incident has renewed attention on efforts to replace outdated air traffic control equipment and strengthen the resilience of the national aviation network.
Although departures resumed Friday evening, the disruption raised important questions about whether the FAA’s existing infrastructure can adequately support growing air traffic demands.
Federal aviation officials are expected to continue evaluating the failure and measures needed to prevent similar nationwide disruptions.
For travelers, the incident serves as a reminder that a technical problem affecting the nation’s aviation network can quickly create widespread delays, cancellations, and travel uncertainty.
STM Daily News — News You Can Use This Moment!
Sources and Further Information
Daily News
Los Angeles’ ‘Graffiti Towers’ Cleaned Up as Oceanwide Plaza Awaits Next Chapter
Last Updated on November 13, 2026 by Daily News Staff
STM Daily News | November 12, 2026
Graffiti Cleanup Transforms Oceanwide Plaza
LOS ANGELES — The unfinished skyscrapers known as downtown Los Angeles’ “Graffiti Towers” have reached a visible milestone: most of the exterior tagging has been removed, although completing the long-stalled Oceanwide Plaza development remains a separate challenge.
City officials celebrated the cleanup November 12. According to the mayor’s office, crews cleared graffiti from roughly 250 balconies across the three-tower complex opposite Crypto.com Arena and near the Los Angeles Convention Center. Remaining work has included touch-ups on windows and other exterior areas.
Oceanwide Plaza was envisioned as a mixed-use destination with residences, a luxury hotel, shops and restaurants. Construction stopped in 2019 after Beijing-based developer Oceanwide Holdings could no longer finance the project.
In early 2024, trespassers covered the unfinished towers with graffiti, turning them into an internationally recognized sight. The property also attracted dangerous stunts and heightened concerns about security.
The development entered bankruptcy in February 2024. This July, a bankruptcy court approved a purchase arrangement involving KPC Square, a joint venture between KPC Group and Lendlease. Graffiti removal began while the acquisition was still pending.
What Comes Next for LA’s Graffiti Towers?
The partnership is targeting a January 2027 closing, according to the Los Angeles Business Journal. Financing, a construction contract and required approvals remain important steps before the development can be completed.
For downtown residents and businesses, the cleanup marks tangible progress at a prominent property. However, it does not mean the towers are ready to open, and no firm opening date has been announced.
Sources
- Los Angeles Mayor’s Office, November 12, 2026: https://mayor.lacity.gov/news/mayor-bass-celebrates-graffiti-removal-oceanwide-plaza-clearing-way-full-restoration-and
- Los Angeles Business Journal, November 9, 2026: https://labusinessjournal.com/real-estate/cleaning-up-oceanwide/
- City News Service / MyNewsLA, November 12, 2026: https://mynewsla.com/life/2026/11/12/graffiti-cleanup-milestone-marked-at-oceanwide-plaza-in-downtown-la/
