Connect with us

infrastructure

Biden Administration Boosts California High-Speed Rail Project

Boosting the California High-Speed Rail Project: Biden Administration has granted $202 million to California High-Speed Rail for grade separations in Shafter.

Published

on

Last Updated on September 13, 2025 by Rod Washington

California High-Speed Rail Project
Photo from the California High-Speed Rail Authority shows the Excelsior Avenue Grade Separation Project between Seventh Avenue and Highway 43 in Kings County.

Boosting the California High-Speed Rail Project

The California High-Speed Rail Authority has recently secured a significant financial boost from the Biden Administration, receiving over $200 million in federal funding. This grant, one of the largest in the project’s history, is a major step forward for the California High-Speed Rail (CAHSR) and highlights the continued commitment to advancing clean and innovative transportation projects in the state. In this blog post, we will explore the details of the grant, its intended use, and the potential impact on the future of high-speed rail in California.

Federal Funding for Grade Separations

The U.S. Department of Transportation awarded a $202 million grant to the California High-Speed Rail Authority through the 2022 Consolidated Rail Infrastructure and Safety Improvements (CRISI) program. This funding will be utilized for the completion of six grade separations in the city of Shafter, located in Kern County, approximately 18 miles northwest of Bakersfield.

Grade separations involve re-aligning roadways over or under railways to eliminate potential hazards. The grant will cover the design and construction of these grade separations, as well as the acquisition of necessary right-of-way to separate car and pedestrian traffic from trains along various avenues and highways in Shafter.

Enhancing Safety and Preparing for High-Speed Trains

The completion of these grade separations will eliminate street-level crossings at busy intersections along the current freight rail corridor. By doing so, the High-Speed Rail Authority aims to reduce accidents and injuries and prepare the local community for the introduction of high-speed trains traveling at speeds of up to 220 mph.

Strong Partnership and Commitment

Officials from the California High-Speed Rail Authority and Governor Gavin Newsom’s administration have expressed their appreciation for the federal funding, considering it a testament to the strong partnership between the state and federal government. Governor Newsom emphasized the shared commitment to advancing clean and electrified high-speed rail projects, stating that these dollars signal a dedication to bringing such transportation advancements to the largest and fastest-growing cities in California by the end of the decade.

Project Timeline and Progress

Construction on the grade separations in Shafter is projected to commence in August 2025 and conclude by August 2028. With over 25 active construction sites and environmental hurdles cleared along 422 miles of the Bay Area to Los Angeles segment, progress on the California High-Speed Rail project is evident. The plan is to open the middle section, connecting Merced to Bakersfield along a 171-mile track, in 2030.

Advertisement
Get More From A Face Cleanser And Spa-like Massage

Future Expansion and Innovation

The funding for these grade separations marks a significant milestone as it represents the first project outside the currently active construction areas. CAHSR is actively working on expanding construction work beyond the existing miles, with 119 miles already under construction. Additionally, the project has begun the process of obtaining trainsets capable of reaching speeds of 220 mph, offering a glimpse into the future of high-speed rail in California.


2023 04 25 Davis Avenue 4
Image from the California High-Speed Rail shows the Davis Avenue Overcrossing Project, a grade separation along Davis Avenue in Fresno County.

The substantial grant from the Biden Administration demonstrates a strong commitment to advancing the California High-Speed Rail project. By investing in grade separations, the government aims to enhance safety and prepare for the arrival of high-speed trains. With active construction sites, cleared environmental hurdles, and plans for future expansion, the California High-Speed Rail is well on its way to becoming a reality. This investment paves the way for cleaner and innovative transportation projects that will benefit Californians for years to come.

Source: KTLA

https://ktla.com/news/california/california-high-speed-rail-gets-big-boost-from-biden-administration/?ipid=promo-link-block1

Start Your Morning Informed

Get the STM Morning Brief delivered to your inbox every weekday with breaking news, transportation updates, technology, science, and trending stories.

STM News Brief Ad 2

We don’t spam! Read our privacy policy for more info.

STM Blog

From Hand Signals to Smart Crosswalks: The Evolution of the Modern Pedestrian Signal

Discover the history of the modern pedestrian signal, from Garrett A. Morgan’s groundbreaking traffic signal to today’s smart, accessible crosswalks.

Published

on

Last Updated on July 12, 2026 by Daily News Staff

The Evolution of the Modern Pedestrian Signal

Every day, millions of people rely on pedestrian signals to cross busy street safely. A glowing white walking figure, an orange-red hand, and a countdown timer have become familiar sights around the world. While these signals may seem like simple pieces of infrastructure, they are the result of more than a century of innovation, engineering, and public safety improvements.

The modern pedestrian signal did not appear overnight. Instead, it evolved through the contributions of inventors, engineers, city planners, and transportation officials who continually refined traffic control systems as cities grew and automobiles became more common.

The Early Days of Traffic Control

Before electric traffic signals, intersections were controlled by police officers, railway-style semaphores, or even hand signals. As horse-drawn wagons gave way to automobiles in the early 1900s, traffic congestion and accidents increased dramatically, creating an urgent need for better traffic management.

One of the earliest electric traffic lights was installed in Cleveland, Ohio, in 1914. It used red and green lights and was manually operated. While it improved vehicle movement, pedestrians still had to judge for themselves when it was safe to cross.

How the Modern Pedestrian Signal Changed the Way We Cross Streets

Garrett A. Morgan’s Breakthrough

One of the most important milestones came in 1923 when inventor and entrepreneur Garrett Augustus Morgan received U.S. Patent No. 1,475,024 for an improved traffic signal.

Morgan’s design introduced a third position in addition to “Stop” and “Go.” This intermediate phase temporarily stopped traffic in every direction before allowing vehicles to proceed. The brief pause reduced confusion at intersections and provided additional time for pedestrians to cross safely.

Morgan reportedly developed his design after witnessing a serious traffic accident. His invention demonstrated how thoughtful engineering could improve public safety while making increasingly busy streets more efficient.

Although Morgan did not invent the illuminated “WALK” and “DON’T WALK” pedestrian signal used today, his three-position signal became a foundational step in the evolution of modern traffic control.

The Birth of Dedicated Pedestrian Signals

As cities expanded after World War II, pedestrian safety became an even greater concern. More people were walking in increasingly crowded downtown districts, and separating pedestrian movements from vehicle traffic became a priority.

Advertisement
Get More From A Face Cleanser And Spa-like Massage

During the early 1950s, several American cities began experimenting with dedicated pedestrian signals. New York City became one of the first major municipalities to install illuminated “WALK” and “DON’T WALK” signs at busy intersections.

These early systems gave pedestrians their own designated crossing phase, reducing conflicts with turning vehicles and improving safety at some of the nation’s busiest intersections.

Standardization Across America

By the 1960s and 1970s, traffic engineers recognized the importance of creating consistent traffic control devices nationwide.

The Manual on Uniform Traffic Control Devices (MUTCD) established national standards for traffic signs, pavement markings, and pedestrian signals. Standardized designs helped ensure that pedestrians could understand crossing signals regardless of where they traveled in the United States.

Eventually, words gave way to internationally recognized symbols—a walking person to indicate it was safe to cross and an upraised hand to indicate pedestrians should wait. These symbols transcended language barriers and improved accessibility for visitors and non-English speakers.

The Countdown Era

One of the most significant modern improvements arrived with pedestrian countdown timers.

Rather than simply flashing a warning, countdown displays show exactly how many seconds remain before the crossing phase ends. Research has shown that countdown timers help pedestrians make better crossing decisions and improve compliance with traffic signals.

Today, countdown timers have become standard equipment at intersections across much of the United States.

Accessibility Takes Center Stage

Modern pedestrian signals are designed to serve everyone.

Accessible Pedestrian Signals (APS) now provide audible tones, spoken messages, vibrating push buttons, and locator sounds that assist pedestrians who are blind or have low vision. These features allow more people to navigate intersections independently and safely.

Advertisement
Get More From A Face Cleanser And Spa-like Massage

The continued development of accessible technology reflects a broader commitment to making transportation systems inclusive for all users.

The Future of Pedestrian Safety

Pedestrian signals continue to evolve.

Many cities now use smart traffic systems that detect pedestrians waiting to cross, automatically adjust signal timing based on traffic conditions, and prioritize people walking during busy periods.

Researchers are exploring artificial intelligence, connected vehicle technology, and sensor-based systems capable of communicating directly with autonomous vehicles. Future pedestrian crossings may adapt in real time to weather conditions, crowd sizes, emergency vehicles, and even the needs of older adults or individuals with disabilities.

A Legacy Built by Many Innovators

The pedestrian signal we know today is the product of more than a century of collaboration and innovation.

Early traffic engineers created the first electric traffic lights. Garrett A. Morgan improved intersection safety with his groundbreaking three-position traffic signal. Transportation agencies standardized traffic control devices, while engineers continued refining pedestrian technology through countdown timers, accessible features, and intelligent traffic systems.

Every safe crossing today reflects the work of countless inventors, planners, researchers, and public officials dedicated to protecting lives.

As cities continue to grow and transportation technology advances, the humble pedestrian signal remains one of the most effective—and often overlooked—public safety innovations ever developed.

At STM Daily News, we celebrate the inventors, engineers, and visionaries whose everyday innovations quietly improve life for millions of people. Sometimes the most important inventions aren’t the ones that grab headlines—they’re the ones we depend on every single day without giving them a second thought.

Related Reading

🧠 Discover the remarkable innovators, inventors, and trailblazers who helped shape our world but rarely receive the recognition they deserve. Share your thoughts in the comments and subscribe to the STM Daily News newsletter to catch every new Forgotten Genius Friday feature and more inspiring stories delivered to your inbox.

Advertisement
Get More From A Face Cleanser And Spa-like Massage

Continue Reading

The Knowledge

Beneath the Waves: The Global Push to Build Undersea Railways

Undersea railways are transforming transportation, turning oceans from barriers into gateways. Proven by tunnels like the Channel and Seikan, these innovations offer cleaner, reliable connections for passengers and freight. Ongoing projects in China and Europe, alongside future proposals, signal a new era of global mobility beneath the waves.

Published

on

Train traveling through underwater tunnel
Trains beneath the ocean are no longer science fiction—they’re already in operation.

For most of modern history, oceans have acted as natural barriers—dividing nations, slowing trade, and shaping how cities grow. But beneath the waves, a quiet transportation revolution is underway. Infrastructure once limited by geography is now being reimagined through undersea railways.

Undersea rail tunnels—like the Channel Tunnel and Japan’s Seikan Tunnel—proved decades ago that trains could reliably travel beneath the ocean floor. Today, new projects are expanding that vision even further.

Around the world, engineers and governments are investing in undersea railways—tunnels that allow high-speed trains to travel beneath oceans and seas. Once considered science fiction, these projects are now operational, under construction, or actively being planned.

image 3

Undersea Rail Is Already a Reality

Japan’s Seikan Tunnel and the Channel Tunnel between the United Kingdom and France proved decades ago that undersea railways are not only possible, but reliable. These tunnels carry passengers and freight beneath the sea every day, reshaping regional connectivity.

Undersea railways are cleaner than short-haul flights, more resilient than bridges, and capable of lasting more than a century. As climate pressures and congestion increase, rail beneath the sea is emerging as a practical solution for future mobility.

What’s Being Built Right Now

China is currently constructing the Jintang Undersea Railway Tunnel as part of the Ningbo–Zhoushan high-speed rail line, while Europe’s Fehmarnbelt Fixed Link will soon connect Denmark and Germany beneath the Baltic Sea. These projects highlight how transportation and technology are converging to solve modern mobility challenges.

The Mega-Projects Still on the Drawing Board

Looking ahead, proposals such as the Helsinki–Tallinn Tunnel and the long-studied Strait of Gibraltar rail tunnel could reshape global affairs by linking regions—and even continents—once separated by water.

Why Undersea Rail Matters

The future of transportation may not rise above the ocean—but run quietly beneath it.

Continue Reading

Blog

The Dodger Gondola Project: A High-Flying Transit Idea Facing Heavy Headwinds

The Dodger Gondola Project, a proposed aerial transit line between Union Station and Dodger Stadium, faces major political, legal, and community opposition in 2025. Here’s where the controversial project stands now.

Published

on

Dodger Gondola Project
Imagine credit: Aerial Rapid Transit Technologies/ LA Metro

Dodger Gondola Project Faces Major Setbacks as L.A. Leaders and Residents Push Back


For years, the Los Angeles Aerial Rapid Transit (LA ART) — better known as the Dodger Gondola Project — has been pitched as a bold, futuristic connection between Union Station and Dodger Stadium, whisking riders above traffic in a six-minute aerial trip. Supporters call it L.A.’s chance to build a cleaner, faster, iconic transit link. But as 2025 winds toward its close, the project faces more turbulence than ever.

A Quick Refresher: What the Gondola Would Be

The proposed gondola line would travel about 1.2 miles, with stations at Union Station, a stop near L.A. State Historic Park, and Dodger Stadium. Private backers connected to former Dodgers owner Frank McCourt have promoted it as a zero-emission way to move more than 5,000 passengers per hour on game days — and potentially daily for tourists, residents, and park visitors.

Why the Dream Is Stalling

In November 2025, the Los Angeles City Council voted 12–1 to formally oppose the project, urging Metro to abandon it. While the vote isn’t legally binding, it signaled a major political shift. Councilmember Eunisses Hernandez, who introduced the resolution, cited environmental and community concerns — especially the impact on Chinatown, Solano Canyon, and L.A. State Historic Park.

A California Court of Appeals ruling earlier in the year also struck down Metro’s original environmental review, forcing a supplemental EIR that reopened debates about tree removal, tower placement, noise, and neighborhood impacts. The city has additionally ordered a comprehensive traffic study, pausing key permits until it’s complete.

Communities Speak Out

Local opposition has been strong and well-organized. Residents warn the gondola would remove mature trees, alter the character of the State Historic Park, and intrude over communities that have already shouldered decades of infrastructure burdens. Advocacy groups say the project favors private interests over public need, pointing to the lack of a clear long-term funding or maintenance plan.

Not Dead — But Deeply Uncertain

Despite mounting challenges, the gondola isn’t entirely grounded. Metro is still reviewing public comments on the supplemental environmental report, and state lawmakers are debating legislation that could streamline some project requirements. Whether those efforts succeed — or whether political pressure ultimately stalls the gondola indefinitely — remains to be seen.

Advertisement
Get More From A Face Cleanser And Spa-like Massage

The Big Picture

The Dodger Gondola Project sits at the intersection of transit innovation, environmental justice, and the future of Los Angeles mobility. For supporters, it represents a chance to modernize travel to one of the nation’s most visited stadiums. For opponents, it’s an unnecessary experiment that risks community space and public resources.

Either way, the next year will be pivotal — and L.A.’s debate over the gondola is far from over.

Sources and links for further information

Attachment.pngAssociated Press: “Los Angeles officials seek to halt proposed Dodger Stadium gondola” — apnews.com 

Attachment.pngLos Angeles Times: “Los Angeles City Council votes 12-1 to urge Metro to halt Dodgers gondola project” — latimes.com 

Attachment.pngNBC Los Angeles: “Dodger Stadium gondola should be a no-go, LA City Council says” — nbclosangeles.com 

Attachment.pngPR Newswire (project press release): “LA ART Gondola Project Takes Next Step Forward … with Release of Draft Supplemental Environmental Report” — prnewswire.com 

Attachment.pngLAist: “Controversial Dodger Stadium gondola project gets new environmental report. Here’s how you can weigh in” — laist.com 

Attachment.pngOfficial Metro page: “Los Angeles Aerial Rapid Transit (LA ART)” — metro.net 

Attachment.pngSite for public comment: “Stop The Gondola – Public Comment” — stopthegondola.org 

Attachment.pngCEQA Notice of Availability: “Draft Supplemental Environmental Impact Report – LA ART Project” — ceqanet.lci.ca.gov 

https://stmdailynews.com/rediscovering-the-charm-of-mass-transit-a-personal-perspective/
https://stmdailynews.com/rediscovering-the-charm-of-mass-transit-a-personal-perspective/
Continue Reading

Trending